Thursday 11 October 2012

Fast moves for nuclear development in Russia

Fast moves for nuclear development in Russia: http://www.world-nuclear-news.org/NN_Fast_moves_for_nuclear_development_in_Siberia_0410121.html "n experimental lead-cooled nuclear reactor will be built at the Siberian Chemical Combine (SCC). If successful, the small BREST-300 unit could be the first of a new wave of Russian fast reactors.
The Tomsk region that hosts the SCC signed an agreement with
state nuclear company Rosatom during an official visit at the end of September. It specified that a demonstration BREST-300 unit would be built at the site, along with the manufacturing facility for the dense nitride uranium-plutonium fuel that it would need. The cost was put at RUR25 billion ($805 million) for the 300 MWe reactor and RUR17 billion ($54 million) for the fuel plant.
Russia already uses a BN-series fast reactor for power production at Beloyarsk with another under construction and more proposed for several other sites. However, the BREST design is seen as a successor to the BN series and the 300 MWe unit at the SCC could be the forerunner to a 1200 MWe version for wide deployment as a commercial power generation unit. The development program is as part of an Advanced Nuclear Technologies Federal Program 2010-2020 that seeks to exploit fast reactors as a way to be vastly more efficient in the use of uranium while 'burning' radioactive substances that otherwise would have to be disposed of as waste."
 
More on small nuclear power reactors: http://www.world-nuclear.org/info/inf33.html

No comments:

Post a Comment